On May 31, 2021, we inaugurated the Anyang Stream Crossing Pedestrian Bridge that we constructed.
The bridge, which began construction in May 2019, spans a length of 201 meters and has a width of 4.5 to 15 meters. It is the first cable-stayed pedestrian bridge over Anyang Stream.
Today marks the official opening ceremony, and the bridge will now be known as the “Geumcheon Hannae Bridge”.